Wednesday 19 December 2012

Shop transformation Part 7 - Fitting out

I ground the floor smooth with a diamond grinder hired from HSS, who are a national tool hire company,  including a large vacuum extractor. I wasn't going to use my own shop vac! That was hard work as the actual grinder is very heavy and my hip was not in the best of conditions. However all I had to do was lean on the machine and move it from side to side so it was not too onerous. Needless to say it generated a lot of concrete dust but I was rewarded with a nice, flatish bare concrete floor.

The next day I started painting the floor. Or rather I should say painting 2/3rds of the floor! According to the Regal Paints website there should have been sufficient paint for the entire 410 square feet with a little leftover. In practice there was only enough sealer coat for around 250 square feet or roughly 2/3rds of the shop.